Cubic occupied-ladder singles products¶
The experimental cubic_occupied_ladder_terms action selects the two
ooov*ss dressings of the finite BIPOLE occupied ladder. It reuses the
authenticated terminal provider from the
fixed-T2 singles action.
Streamed action and resources¶
One exclusive terminal lease visits 256 domains and 6,912 normalized
elements. Two seven-by-six-by-six occupied intermediates hold the X/Y
weights. The action then constructs six projected singles for one target
and streams one outer product at a time. Its immutable x, y, total
outputs use the accepted exchanged-leg placed convention. It does not
allocate a dense production ERI or a target-by-source product inventory.
resource_census() counts inputs and copies, the AO metric and frames,
AO/Bloch singles and occupied columns, occupied intermediates, projection
scratch, singles products, accumulators, immutable outputs and retained
earlier contributions. The conservative numerical bound is 30,496 bytes,
within a 64 KiB subreservation of the existing 1 MiB transform slot.
The total action cap remains 42,991,616 bytes and 231,276,511,232 work
units. Exact limits pass; one byte or work unit below refuses before
contraction. This is an array reservation, not a process-RSS bound.
Terminal generation and pair frames are authenticated before and after
the action. Signed transfers, omitted G=0 and finite erfc subtraction
are unchanged.
Oracle and assembly boundary¶
The executable regression
first constructs independent dense 12-AO supercell contractions with
independently placed PAO/PNO frames. It evaluates each term and their sum
on all 36 ordered targets, 174 components per comparison, at a
predeclared absolute 1e-10 Ha tolerance. The accepted four-band
unshifted (3,1,1) fixture retains unequal ranks, domains, and nonzero
deterministic diagonal singles. It includes targets with distinct X/Y
values. Premature input projection, transposed output legs, and a
spurious half coefficient must each fail above tolerance.
For example, at zero-based target/component (5,3,1,0), the independent
X and Y values are -0.0003141764942972162 and
+0.00017278125150538157 Ha. Their difference is well above tolerance.
The oracle-only run isolates the cubic sum from the native snapshot to
8.7105e-16 Ha. Premature input projection fails by 1.3564e-4 Ha and
transposing the output product fails by 2.5992e-4 Ha.
The actual native reference boundary is occupied_ladder - bare.
To isolate these cubic terms, explicitly subtract independent
oooo*T2, oooo*ss, both fixed-T2 ooov dressings, and the complete
half-weighted expression. The reference-only dense and signed-spectral
calculations do not qualify the other production terms. Molecular total
energies are not matching references for this isolated finite operator.
The precisely defined partial assembly is
Here X/Y are the accepted fixed-T2 terms. The half-weighted expression
is its occurrence in the occupied block; the separately qualified full
virtual ladder must not be added inside this snapshot. The subsequent complete occupied-family qualification
adds oooo*T2 and oooo*ss, qualifies the T1-free sum and compares the
whole occupied-minus-bare increment. The cubic and earlier arrays remain
exactly unchanged. No occupied term remains on this finite fixture;
R2 Fock dressings, rings, R1, iteration, triples and materials remain open.
The partial assembly runs three sequential actions at their individual caps, totaling 693,829,533,696 work units. It does not claim a fused pass. The qualification compares the earlier X, Y, linear sum, half term and earlier partial sum bit-for-bit with their accepted receipt; full virtual qualification and normalized ooov momentum evidence are reused.
The physical qualification passes all 36 targets and 174 components per
comparison. Maximum production errors are 1.0460e-16 Ha for X,
1.0482e-16 Ha for Y, 1.1714e-16 Ha for their sum and 9.1681e-16 Ha
for the partial occupied assembly. Earlier outputs are exactly unchanged.
Zero singles, negative and positive cubic rescaling, exchanged-leg
reversal, stale state/generation/frame checks and exact/one-below resource
limits pass. The single operational receipt records every signed component,
source/native identities and measured resources outside the product tree.